To:Robert Williams, School of Architecture
From:James. Johnson
Subject:Air-conditioning Installation Costs for East Hall
Date:June 4, 2006
I amwriting to inform you of the costs of installing air-conditioning for the sevenoffices
and two studio classrooms in East Hall.
Office and Classroom Installation
Estimates were obtained from three contractors on the costs ofcovering the offices and
class-rooms. All these three were in the $20,000 to$25,000 range.The work would take .about three weeks.
Because the central unit would be installed on the roof, some noiseproblems might occur during
a four-or five-day period. And this work could bestarted from this weekend, and the over-time
labor costs of about $1,500 havebeen included in the estimates.
Additional Installation
Because a larger installation, including amore powerful central unit,
would be necessary to handle the halls andstairways, an additional
$6,000 would be required for the equipment. If thisadditional work were delayed
until a later time, a new central unit would berequired along with changes in the pipe way.
Subject: 46 Costs for East Hall
Office and Classroom Installation:
1.Covering area: seven offices and two 47
2.Possible problem: some 48 might occur during, a four- or five-day period
Additional Installation:
1.Budget: $6,000
2.Amore powerful ____49 , is needed to handle the halls and stairways3.Additional installation
postponement will result in changes in 50