201边垂线标定setting-out of side plumb—bob
202竖井激光指向laser guide of vertical shaft
203井筒延伸测量shaft-deepening survey
204特殊凿井法施工测量construction survey for special method of shaft sinking
205冻结法施工测量construction survey for freezing method of shaft sinking
206冻结壁交圈图closure plan of ice wall
207钻井法施工测量construction survey for shaft drilling
208沉井法施工测量construction survey for deep shaft sinking
209矿井提升设备安装测量survey for shaft winding plant installation
210巷道中线标定setting—out of center line of workings
211巷道坡度线标定setting-out of workings slope
212激光导向仪给向setting-out of driving workings direction by laser guide
instrument
213交叉点放样(又称“颁岔放样”)setting-out of junction
214巷道验收丈量footage measurement of workings
215贯通测量holing through survey breakthrough survey
216矿床几何[学]mineral deposits geometry
217矿体几何制图geometrisation of ore body
218矿产性质几何制图geometrisation of mineral property
219井下勘探测量underground prospecting survey
220矿层要素测定determination of seam elements
221储量管理reserve management
222开采沉陷观测mining subsidence observation
223开采沉陷预计prediction of mining subsidence
224地表移动观测站observation station of surface movement
225移动角angle of critical deformation
226边界角boundary angle, limit angle
227边坡稳定性观测observation of slope stability
228矿山测量图mining map
229井田区域地形图topographic map of mining area
230矿场平面图mining yard plan
231井底车场平面图shaft bottom plan
232采掘工程平面图mining engineering plan
233主要巷道平面图main workings plan
234井上下对照图surface-underground contrast plan
235露天矿矿图opencast mining plan
236采剥工程断面图striping and mining engineering profile
237采剥工程综合平面图synthetic plan of striping and mining
238排土场平面图waste dump plan
239防排水系统图water-proof and drainage system plan
240矿山测量交换图exchanging documents of mining survey